WESgraphwind farm domain knowledge graph
VariableNRELCostBreakdown

Assembly & Installation cost

Assembly and installation activities conducted at the staging port and at the project site. Assume that financial costs related to warranties, contractor insurance, SG&A, profit margin, etc, are loaded in day rates for vessels, labor, and equipment

typereal
unit¤

Open in the explorer → Suggest an edit

Has parts 7

Part of 1

References

Contributed by

S. Sanchez Perez Moreno (TU Delft)

Cite the database: Quaeghebeur, E., Sanchez Perez-Moreno, S., and Zaaijer, M. B.: WESgraph: a graph database for the wind farm domain, Wind Energ. Sci., 5, 259–284, 2020. doi:10.5194/wes-5-259-2020

This page: https://wesgraph.anemona.io/concept/assembly-installation-cost/