All concepts
Every concept in the WESgraph wind farm domain knowledge graph — 1,428 concepts across 6 categories, connected by 2,038 relationships. Explore the interactive graph →
Object 183
Procedure 28
Attribute 130
Phenomenon 10
Variable 848
15 percentile sieve size of rock
15 percentile sieve size of rock in armour layer
15 percentile sieve size of rock in filter layer
15 percentile sieve size of rock or soil below filter layer
3D turbulent wind velocity field
50 percentile sieve size of rock in filter layer
50 percentile sieve size of rock or soil below filter layer
50 percentile sieve size of soil or rock
50% passing nominal diameter
85 percentile sieve size of rock
85 percentile sieve size of rock in filter layer
85 percentile sieve size of rock in filter layer i
85 percentile sieve size of rock or soil below filter layer
90 percentile sieve size of soil
AC Transformers cost alternating-current Transformers cost
access vessel cost
access vessel weather limit
Accommodations cost
active power inertia injection
active soil pressure coefficient
actualised costs without bottom lease and infield cable costs
actualised total bottom lease costs
actualised total energy yield without electrical and array losses
actualised total infield cable costs
Aerodynamic Accessories - Ancillary Equipment cost
Aerodynamic Accessories - Blade cost
aerodynamic blade loads
aerodynamic drag force on cylinder segment
air density
airfoil lift coefficient
ambient TI ambient turbulence intensity
amplification of wave water particle velocity
amplitude of seabed orbital motion
amplitude of seabed orbital velocity
Anchorage - Ancillary Equipment Array Cable cost
Anchorage - Ancillary Equipment Export Cable cost
Anchors cost
Ancillary Equipment - Control & Communication System cost
Ancillary Equipment - Tower Module cost
Ancillary Equipment Array Cable cost
Ancillary Equipment Export Cable cost
Ancillary Systems - Offshore Substation cost
Ancillary Systems - Onshore Substations cost
anemometer measurement height
angle between waves and current
annual energy production
Annual Lease Payments cost
annual loss in electrical infrastructure
annual O&M expenditure annual operation and maintenance expenditure
area occupied by wind farm
area of the site
armour loss factor
armour thickness
Array Cable System - Balance of Station (BOS) cost
Array Cable System - BOS unscheduled maintenance cost Array Cable System - balance of station unscheduled maintenance cost
Array Cable System Commissioning cost
Array Cables - Array Cable System cost
Array Cables - Assembly & Installation cost
array efficiency
Assembly & Installation cost
Assembly Areas cost
Auxiliary Electrical System cost
average wind speed
average work in progress time for lifting activities
axial force normal stress in monopile
axial force stress reduction factor
axial induction factor
Balance of Station (BOS) cost
Ballast System cost
Bearings cost
bedding thermal resistivity
bedding thickness
Bend Restrictors - Protection Array Cable cost
Bend Restrictors - Protection Export Cable cost
Bend Stiffeners - Protection Array Cable cost
Bend Stiffeners - Protection Export Cable cost
bending moment normal stress in monopile
bending moment on support structure
bending moment stress reduction factor
binder thickness
Blade cost
blade element chord length
blade element twist angle
blade flapwise stress history
blade length
blade taper
boat landing procurement cost
Bond cost
BOS scheduled maintenance cost balance of station scheduled maintenance cost
BOS unscheduled maintenance cost balance of station unscheduled maintenance cost
bottom lease cost
Brake cost
Braking System cost
breaking wave height
Buildings/Facilities cost
Buoyancy Modules - Ancillary Equipment Array Cable cost
Buoyancy Modules - Ancillary Equipment Export Cable cost
cable endpoint pair
cable endpoint power flow
capacitance of electrical cable per unit length
capacity factor
Capital Expenditures (CapEx) cost
Civil Infrastructure cost
Closing Costs cost
Coating cost
Coatings cost
collection cable removal cost
collection cables installation cost
collection cables installation fixed cost
Communication System cost
Communications cost
component failure rate
Condition Monitoring cost
Condition Monitoring System cost
conductor screen thickness
conductor temperature rise
Conductors cost
Connecting Hardware cost
Connectors - Ancillary Equipment Array Cable cost
Connectors - Ancillary Equipment Export Cable cost
Construction Financing Costs cost
Construction Management cost
Control & Communication System - Ancillary Systems cost
Control & Communication System - Electrical Module cost
Converter Auxiliaries cost
Converter Power Bus cost
Cooling System - Gearbox cost
Cooling System - Generator cost
costs for year t
costs of access vessel rental
costs of consumables per maintenance visit
costs of consumables per repair of WT failure costs of consumables per repair of wind turbine failure
costs of foundation installation
Cranage cost
crew deployment efficiency
critical compressive stress
critical compressive stress according to theory of elasticity
critical Shields parameter
crosswind distance
cumulative fatigue damage index
cut-in wind speed
cut-out wind speed
cylinder segment base height
cylinder segment base outer diameter
cylinder segment length
cylinder segment taper slope
cylinder segment wall thickness
cylinder segment wall thickness at which Euler buckling would occur
cylinder segment yield stress
Damping System cost
DC Convertor cost direct-current Convertor cost
De-icing system cost
Deck cost
decommissioning cost
decommissioning cost excluding management
decommissioning duration
Dedicated O&M Vessel cost Dedicated operation and maintenance Vessel cost
depth averaged current velocity
Development cost
diameter of outer serving
diameter of the armour
diameter of the binder
diameter of the conductor
diameter of the conductor screen
diameter of the insulation
diameter of the insulation screen
dielectric cable loss per unit length
Diesel Generator Back Up cost
dimensionless grain size
distance from harbour to boundary of wind farm
distance to coast
downstream wind speed deficit
downtime due to failures of type j during storm and catch-up period
downtime due to preparation for type j in storm and catch-up period
downtime due to waiting for lifting equipment
downtime due to waiting for lifting equipment to do n repairs
downtime due to waiting list in steady state
downtime during preparation of repair of a WT failure downtime during preparation of repair of a wind turbine failure
downtime during preparations for failures of type j in steady state
downtime during preventive maintenance
downtime during work in progress for failures of type j in steady state
downtime of failures of type j that happen during a storm
downtime of previously failed turbines during batch i
downtime of turbines that fail during batch i
downtime turbine i , failure type j , storm cycle s and failure k
downwind distance
drag coefficient of the support structure
Drives & Bearings cost
Drivetrain & Nacelle cost
Drivetrain Module - Wind Turbine cost
Drivetrain Module - Wind turbine unscheduled maintenance cost
Drivetrain Support Structure cost
Drop Cable cost
Ducting System - Protection Array Cable cost
Ducting System - Protection Export Cable cost
Due Diligence cost
dune crossing installation cost
duration of repair batch i
dynamic angle of attack variation
dynamic force
ECN Install set of WTs ECN Install set of wind turbines
ECN Install WT type ECN Install wind turbine type
effective TI at hub height effective turbulence intensity at hub height
efficiency of electrical network
Electric Conversion Equipment cost
Electric Module cost
electrical cable active current
electrical cable ambient temperature
electrical cable burial depth
electrical cable copper mass
electrical cable cross section
electrical cable insulation mass
electrical cable insulation maximal temperature
electrical cable length
electrical cable power loss
electrical cable power loss factor
electrical cable procurement cost
electrical cable rated voltage
electrical cable reactive current
electrical cable resistivity at 20°C
electrical cable total current
electrical cables procurement cost
electrical connection system installation cost
electrical connection system procurement cost
electrical connection system removal cost
Electrical Conversion Equip. cost
electrical efficiency
Electrical Module cost
Electrical Module IATC cost Electrical Module integration, assembly, test and checkout cost
Electrical Services cost
Electrical System cost
electrical transmission loss
Enclosure cost
Engineering Certification cost
Engineering cost
Entrance/Exit Fees cost
Environmental Monitoring - Health, Safety and Environmental Monitoring cost
Environmental Monitoring - Health, Safety, & Environmental Monitoring cost
Equipment Support cost
equivalent availability factor
equivalent fatigue damage cycles
equivalent geometrical imperfection
Euler force for cantilever beam according to theory of elasticity
Exit Hatch cost
exponent of storm fraction function
exponent of storm length function
Export Cable System - Balance of Station (BOS) cost
Export Cable System - BOS unscheduled maintenance cost Export Cable System - balance of station unscheduled maintenance cost
Export Cable System Commissioning cost
export cable voltage rating
Export Cables - Assembly & Installation cost
Export Cables - Export Cable System cost
External Lighting cost
Fabrication Facilities cost
Facilities cost
factor on wage for number of shifts per day
factor on wage for shift length
Fasteners - Blade cost
Fasteners - Substructure cost
Fasteners - Tower System cost
FEED cost front-end engineering design cost
Filtering System cost
Financial Closing Costs cost
Fire Protection System cost
fishing zone
fixed installation costs
force in wind direction parallel to horizontal on support structure
Foundation - Foundations & Substructures Assembly & Installation cost
Foundation - Substructure & Foundation cost
Foundation - Substructure & Foundation Offshore substation cost
foundation removal cost
Foundations & Substructures Assembly & Installation cost
Foundations cost
foundations installation cost
free stream wind direction
free stream wind speed
free stream wind speed at height of interest
free stream wind speed at hub height
free stream wind speed at reference height
free stream wind speed probability mass function conditional on direction
free stream wind velocity
Frequency Converter cost
frequency of alternating current
friction speed
Fuel Tanks cost
Gearbox cost
gearbox ratio
Gears cost
General and Administrative cost
Generator cost
generator electrical power output
generator speed
Geotechnical & Geophysical Surveys cost
gravitational acceleration at sea level
gravity force on cylinder segment
grid cable rated voltage
grid charge cost
grid frequency deviation
grout mass
grout procurement cost
Grout, Grout Lines, & Seals cost
harbour and navigation
harbour use for installation cost
Health and Safety Monitoring cost
Health, Safety and Environmental Monitoring cost
Health, Safety Monitoring cost
Health, Safety, & Environmental Monitoring cost
heavily loaded induction factor
height of interest
Helicopter Deck cost
High Speed Shaft and Braking System cost
High Speed Shaft cost
High Voltage Switchgear cost
Housing cost
Hub cost
hub height
Hub System cost
human activities
hydraulic roughness length
Hydraulics cost
hydrodynamic drag force on cylinder segment
hydrodynamic inertia force on cylinder segment
individual pitch angle demand
inductance
inertia coefficient of the support structure
infield cable rated voltage
insulation screen thickness
insulation thermal resistivity
insulation thickness
Insulators cost
insurance cost
Insurance During Construction (IDC) cost
Integration, Assembly, Test, and Checkout cost
Interconnection & Power Marketing cost
Interconnection Studies & Fees cost
Internal Environment cost
Internal Maintenance Hoist cost
investment costs procurement transformer
J-tube cost
J-tube Seals - Protection Array Cable cost
J-tube Seals - Protection Export Cable cost
Kármán's constant
Keulegan-Carpenter number
kinematic viscosity of water
Ladders cost
Laminates cost
Landfall Operations cost
Laydown Area cost
Laying/Trenching - Array Cables cost
Laying/Trenching - Export Cables cost
LCOE levelised cost of energy
Lease Acquisition Activities cost
Legal Support cost
length of overlap between monopile and transition piece
lifetime number of preventive maintenance actions
lifetime O&M cost lifetime operation and maintenance cost
Lightening protection cost
Lightning Protection System cost
loaded power loss in electrical infrastructure at rated power
loaded power loss in transformer at rated power
local angle of attack
Long Term Service Agreement cost
Low Speed Shaft cost
Low Speed Shaft and Main Bearing System cost
Lube System cost
Lubrication System cost
Main Bearing cost
Main Transformer cost
maintenance cost
Maintenance cost
maintenance lifting equipment rental cost
maintenance personnel cost
maintenance subsea inspection cost
Marine Coatings - Outfitting Steel cost
Marine Coatings - Substructure cost
Marine Systems cost
material density
maximum shear stress due to current and waves
maximum stress in monopile
mean shear stress due to current and waves
Measurements cost
Medium Voltage Switchgear cost
Messenger Lines & Buoys - Ancillary Equipment Array Cable cost
Messenger Lines & Buoys - Ancillary Equipment Export Cable cost
Messenger lines & buoys cost
met mast installation cost
met mast procurement cost
Met Station cost
Met Station Installation cost
military area
Miscellaneous cost
modulus of elasticity cylinder segment
moment due to aerodynamic drag force on cylinder segment
moment due to eccentricity RNA center of mass moment due to eccentricity rotor-nacelle assembly center of mass
moment due to hydrodynamic drag force on cylinder segment
moment due to hydrodynamic inertia force on cylinder segment
monopile mass
monopile procurement cost
monopile wall thickness
Mooring Lines cost
Nacelle Auxiliaries cost
nacelle mass
Nacelle Module - Wind Turbine cost
Nacelle Module - Wind turbine unscheduled maintenance cost
Nacelle Module IATC cost Nacelle Module integration, assembly, test and checkout cost
Nacelle Sensors cost
Nacelle Structure cost
no-loaded power loss in electrical infrastructure
no-loaded power loss in transformer
normal stress due to axial load
normal stress due to bending moment
Nose Cone cost
number of blades
number of cable terminations
number of crews per shift
number of failures of type j
number of failures of type j , after storm
number of failures of type j during repair batch i
number of failures of type j during steady state
number of failures of type j during storm and catch-up period
number of failures that require lifting equipment
number of lines
number of mobilisations of lifting equipment for n repairs
number of mobilisations of lifting equipment per year
number of operational turbines during the steady state
number of passengers per vessel
number of people per crew
number of shifts per day
number of storms during lifetime of wind farm
number of sub-batches of repair batch i
number of substation hubs
number of switchboard panel sections
number of switchgear cubicles at grid connection point
number of switchgear cubicles at infield side of platform
number of switchgear cubicles at transmission side of platform
number of switchgear cubicles in WTs number of switchgear cubicles in wind turbines
number of transformers at each voltage rating
number of turbines with failures of type j at start of repair batch i
number of vessels
number of WTs number of wind turbines
number of WTs in branch upstream of the position in the cable number of wind turbines in branch upstream of the position in the cable
O&M cost operation and maintenance cost
O&M cost excluding management operation and maintenance cost excluding management
O&M Equipment Purchases cost operation and maintenance Equipment Purchases cost
Ocean Monitoring cost
off-shore platform procurement and installation cost
Offshore Accommodations Platform - Assembly & Installation cost
Offshore Accommodations Platform - Other Infrastructure cost
Offshore Substation - Balance of Station (BOS) cost
Offshore Substation - BOS unscheduled maintenance cost Offshore Substation - balance of station unscheduled maintenance cost
Offshore Substation Assembly & Installation cost
oil and mining zone
On-board Crane cost
Onboard Crane cost
Onshore Electric Infra. Commissioning cost
Onshore Electric Infra. cost
Onshore Electric Infrastructure Assembly & Installation cost
Onshore Electric Infrastructure cost
Onshore O&M Facilities cost Onshore operation and maintenance Facilities cost
Onshore Substation cost
Onshore Substation IATC cost Onshore Substation integration, assembly, test and checkout cost
Onshore Substations cost
Operating Equipment & Facilities Lease cost
Operating Insurance cost
Operational Expenditures (OpEx) cost
operations administration cost
operations cost
Operations cost
Other Infrastructure - Balance of Station (BOS) cost
Other Infrastructure - BOS unscheduled maintenance cost Other Infrastructure - balance of station unscheduled maintenance cost
outer diameter of monopile
outer diameter of tower
outer serving thermal resistivity
outer serving thickness
Outfitting Steel - Substructure & Foundation cost
Outfitting Steel - Topside cost
Overhead Lines cost
Overhead Transmission Lines cost
OWES auxiliaries installation cost offshore wind energy system auxiliaries installation cost
OWES auxiliaries procurement cost offshore wind energy system auxiliaries procurement cost
OWES CAPEX offshore wind energy system capital expenditure
OWES CAPEX excluding management offshore wind energy system capital expenditure excluding management
OWES installation cost offshore wind energy system installation cost
OWES on-shore premises procurement cost offshore wind energy system on-shore premises procurement cost
OWES procurement cost offshore wind energy system procurement cost
OWF age offshore wind farm age
OWF availability configuration offshore wind farm availability configuration
OWF availability factor offshore wind farm availability factor
OWF available wind power offshore wind farm available wind power
OWF design life offshore wind farm design life
OWF installation plan offshore wind farm installation plan
OWF installation plan step offshore wind farm installation plan step
OWF power conversion factor offshore wind farm power conversion factor
OWF power output offshore wind farm power output
OWF power output limit offshore wind farm power output limit
OWF rated power offshore wind farm rated power
Paint and coatings cost
passive soil pressure coefficient
Permit Acquisition Activities cost
Permitting & Leasing cost
permittivity of insulation material
Personnel Access and Survival Equipment cost
Personnel Access System cost
phase angle between charging and capacitive current
pile clamping depth below mudline
Piles cost
pitch angle
Pitch Cabinet cost
Pitch Drive cost
Pitch System cost
Poisson's ratio of cylinder segment
polyethylene sheath thickness
Port & Staging cost
Port Fees cost
Port Improvements cost
position in cable
Power Circuit cost
power coefficient
Power Conditioning cost
power curve
Power Electrical System cost
power loss in shunt reactor
Power Marketing cost
power rating of offshore shunt reactor
power rating of onshore shunt reactor
power rating of shunt reactor
power rating of transformer
Pre-FEED cost Pre-front-end engineering design cost
preventive maintenance consumables cost
price of electricity
Pricing Effects - Array Cable System cost
Pricing Effects - Export Cable System cost
Pricing Effects - Offshore Substation cost
Pricing Effects - Onshore Electric Infrastructure cost
Pricing Effects - Substructure & Foundation cost
Pricing Effects - Wind Turbine cost
Primary Structure cost
probability of being down and on the waiting list during steady state
probability of mobilising hoisting equipment for n repairs
Procurement cost
production losses due to failures
Professional Advisory Services - Development cost
Professional Advisory Services - Operations cost
Profit (if private developer) cost
Profit (if private operator) cost
Profit cost
Profit Margin cost
Project Certification cost
Project Contingency Budget cost
project development investment costs
Project Management during Construction cost
Project Management during Development cost
Project Management during Operations cost
Protection - Array Cables cost
Protection - Export Cables cost
Protection Array Cable cost
Protection Export Cable cost
Public Outreach cost
Quayside Docking Fees cost
Railings cost
Rayleigh mean wind speed
reactive current in shunt reactor
real interest rate
recreational zone
reference height
relative slenderness ratio for buckling
relative slenderness ratio for global stability
relative wall thickness
removal costs offshore platform and met mast
repairs consumables cost
Reserve Accounts (MRA, DSRA) cost Reserve Accounts (maintenance reserve account, debt service reserve account) cost
resistance per unit length
resistance per unit length at 20°C
resistance per unit length excluding sheath and armour loss
resistive cable loss per unit length
RNA disposal cost rotor-nacelle assembly disposal cost
RNA installation cost rotor-nacelle assembly installation cost
RNA installation off-shore works cost rotor-nacelle assembly installation off-shore works cost
RNA mass rotor-nacelle assembly mass
RNA on-shore transport cost rotor-nacelle assembly on-shore transport cost
RNA procurement cost rotor-nacelle assembly procurement cost
RNA procurement cost warranty percentage rotor-nacelle assembly procurement cost warranty percentage
RNA procurement cost without warranty rotor-nacelle assembly procurement cost without warranty
RNA removal cost rotor-nacelle assembly removal cost
Root Structure cost
rotor aerodynamic torque
Rotor cost
rotor diameter
rotor mass
Rotor Module - Transportation cost
Rotor Module - Wind Turbine cost
Rotor Module - Wind turbine unscheduled maintenance cost
rotor power
rotor radius
rotor rotational speed
rotor swept area
Safety and Security Systems cost
Safety System cost
Salaries - Project Management during Construction cost
Salaries - Project Management during Development cost
Salaries - Project Management during Operations cost
Sales, General, & Administrative - Project Management during Construction cost
Sales, General, & Administrative - Project Management during Development cost
Sales, General, & Administrative - Project Management during Operations cost
Sandwich Core cost
Scour Protection - Protection Array Cable cost
Scour Protection - Protection Export Cable cost
Scour Protection - Foundations & Substructures Assembly & Installation cost
Scour Protection - Substructure & Foundation Offshore substation cost
Scour protection cost
scour protection procurement cost
scour protection removal cost
Seabed Protection Mats - Protection Array Cable cost
Seabed Protection Mats - Protection Export Cable cost
second moment of area of tower
Self-Supporting Towers with Insulators cost
Sensors - Gearbox cost
Sensors - Generator cost
Sensors - High Speed Shaft and Braking System cost
Sensors - Low Speed Shaft and Main Bearing System cost
Sensors - Pitch System cost
set of collection cables
set of electrical cables
set of substation cable endpoints
set of transmission cable grid endpoints
set of transmission cables
set of WT failures set of wind turbine failures
set of WTs set of wind turbines
shear stress due to current
shear stress due to waves
sheath loss factor
sheath thermal resistivity
sheath thickness
Shield Wire cost
shift duration
shift interval
shunt reactor efficiency
shunt reactor procurement cost
Shunt Reactors cost
sieve size of rock
sieve size of rock or soil
significant wave height
significant wave height for accessibility with reference access method
significant wave height threshold
Site Characterization cost
site clearance cost
Siting & Scoping cost
Soft Costs cost
soil density
soil submerged unit weight
soil thermal resistivity
Spar/ Spar Box cost
speed of vessel
Stator cost
steel price
steered wake trajectory
storm fraction
storm fraction for reference access method
storm length
stress reduction factor
Structural & Mechanical cost
Structure cost
Studies & Surveys cost
Substation Commissioning cost
Substation Electrical Conversion Equip IATC cost Substation Electrical Conversion Equip integration, assembly, test and checkout cost
substation power loss
Substation Substructure & Foundation IATC cost Substation Substructure & Foundation integration, assembly, test and checkout cost
Substation Topside & Foundation IATC cost Substation Topside & Foundation integration, assembly, test and checkout cost
substation transformer procurement cost
Substructure - Foundations & Substructures Assembly & Installation cost
Substructure - Offshore Accommodations Platform cost
Substructure - Offshore Substation Assembly & Installation cost
Substructure - Substructure & Foundation cost
Substructure - Substructure & Foundation Offshore substation cost
Substructure & Foundation - Balance of Station (BOS) cost
Substructure & Foundation - BOS unscheduled maintenance cost Substructure & Foundation - balance of station unscheduled maintenance cost
Substructure & Foundation Commissioning cost
Substructure & Foundation IATC cost Substructure & Foundation integration, assembly, test and checkout cost
Substructure & Foundation Offshore substation cost
Substructure Marine Systems cost
support structure procurement cost
Surety Bond (Decommissioning) cost
surface roughness
switch gear procurement cost
switchgear power loss
temperature difference of resistance
Termination Kit - Ancillary Equipment Array Cable cost
Termination Kit - Ancillary Equipment Export Cable cost
Terminations - Array Cables cost
Terminations - Export Cables cost
theoretical Betz limit
thermal resistance between conductor and sheath
thermal resistance between sheath and armour
thermal resistance of outer serving
thermal resistance of soil
thickness of other cable layers
thrust coefficient
thrust curve
thrust force
TI turbulence intensity
time at beginning of catch up of repairs in storm cycle s
time at beginning of storm in storm cycle s
time at end of catch up of repairs in storm cycle s
time at end of storm in storm cycle s
time for ordering of spare parts for WT failure time for ordering of spare parts for wind turbine failure
time in a day
time needed for mobilising lifting equipment
time of failure number k of turbine i with failure type j
time of repair of failure number k of turbine i with failure type j
time of work in progress for repair of WT failure time of work in progress for repair of wind turbine failure
time to process diagnosis information of WT failure time to process diagnosis information of wind turbine failure
tip loss correction factor
Topside - Offshore Accommodations Platform cost
Topside - Offshore Substation Assembly & Installation cost
Topside - Offshore Substation cost
Topside Marine Systems cost
total cable loss per unit length
Total cost of OWES Total cost of offshore wind energy system
total downtime
total downtime assigned to failures of type j
total installation CAPEX total installation capital expenditure
total installation duration
total length of collection cables
total length of transmission cables
total normal stress in monopile
total revenue
total steady state time
total structure height
total time of access vessel rental per year
total time that lifting equipment is in the wind farm per year
tower base bending moment
tower height
Tower Internal Lighting cost
tower mass
Tower Module - Transportation cost
Tower Module - Wind Turbine cost
Tower Module - Wind turbine unscheduled maintenance cost
tower procurement cost
Tower Structure cost
Tower System cost
tower wall cross section area
tower wall thickness
Transition Piece cost
transition piece mass
transition piece outer diameter
transition piece procurement cost
transition piece wall thickness
transmission cable rated voltage
transmission cable removal cost
transmission cables installation cost
transmission cables installation fixed cost
Transmission Charges cost
Transmission rights of way cost
Transmission Towers cost
Transportation - Array Cable System cost
Transportation - Export Cable System cost
Transportation - Onshore Substations cost
Transportation - Substructure & Foundation cost
Transportation - Topside cost
Transportation - Wind Turbine cost
transportation distance onshore
travel time in wind farm
travel time to and from wind farm
TSR tip-speed ratio
Turbine Commissioning cost
turbine spacing distance
Turbines cost
twist angle
Underground Cable System - Onshore Electric Infrastructure Assembly & Installation cost
Underground Cable System - Onshore Electric Infrastructure cost
Underground Cables cost
underwater cabel
unsteady lift coefficient
vertical force on support structure
vessel daily charter rate
Vessel Landing cost
volume of scour protection
waiting time before ordering lifting equipment
wake decay constant
wake deficit
wake expansion factor
Walking/Climbing Infrastructure cost
Warranty cost
water density
water depth
Water Tanks cost
wave amplitude
wave frequency
wave friction factor
wave height
wave period
wavenumber
Weibull scale factor for storm length
Weibull scale factor for storm length for reference access method
Weibull scale parameter
Weibull shape factor for storm length
Weibull shape parameter
Wharfage Fees cost
wind profile power law exponent
Wind Resource Analysis cost
wind speed at hub height
wind speed time series
wind speed Weibull distribution
Wind Turbine Controller cost
Wind Turbine cost
Wind turbine scheduled maintenance cost
Wind turbine unscheduled maintenance cost
winding ratio of transformer
winding ratio substation transformer
winding ratio turbine transformer
work in progress time of all preventive maintenance actions
work in progress time per preventive maintenance action
working hours per preventive maintenance action
WT age wind turbine age
WT array efficiency wind turbine array efficiency
WT availability wind turbine availability
WT available power wind turbine available power
WT decommissioning cost wind turbine decommissioning cost
WT design life wind turbine design life
WT electromechanical power loss factor wind turbine electromechanical power loss factor
WT failure diagnosis time wind turbine failure diagnosis time
WT failure hazard rate wind turbine failure hazard rate
WT failure MTBF wind turbine failure mean time between failures
WT failure repair lifting requirement wind turbine failure repair lifting requirement
WT failure repair time wind turbine failure repair time
WT identifier wind turbine identifier
WT installation cost wind turbine installation cost
WT MTBF wind turbine mean time between failures
WT MTTR wind turbine mean time to repair
WT position wind turbine position
WT potential power output wind turbine potential power output
WT power conversion factor wind turbine power conversion factor
WT power output wind turbine power output
WT procurement cost wind turbine procurement cost
WT rated power wind turbine rated power
WT service interval wind turbine service interval
WT set of failures wind turbine set of failures
WT TBF wind turbine time between failures
WT transformer procurement cost wind turbine transformer procurement cost
WT TTR wind turbine time to repair
WT wakeless power output wind turbine wakeless power output
WTs decommissioning cost wind turbines decommissioning cost
WTs installation cost wind turbines installation cost
WTs procurement cost wind turbines procurement cost
yaw angle
yaw misalignment angle
Yaw Sensors cost
Yaw System cost
Model 229
Database: Quaeghebeur, Sanchez Perez-Moreno & Zaaijer —
paper ·
data (CC BY 4.0).
Built and maintained by Anemona .