The downtime accumulated during repair batch i by turbines that failed earlier and are waiting in the catch-up period, for the case where failures of type j are not repaired in that batch: T_d,w,i,j = N_t,d,i,j⋅T_b,i.
Open in the explorer → Suggest an edit
Cite the database: Quaeghebeur, E., Sanchez Perez-Moreno, S., and Zaaijer, M. B.: WESgraph: a graph database for the wind farm domain, Wind Energ. Sci., 5, 259–284, 2020. doi:10.5194/wes-5-259-2020
This page: https://wesgraph.anemona.io/concept/downtime-of-previously-failed-turbines-during-batch-i-without-repair-of-type-j/