WESgraphwind farm domain knowledge graph
ModelMBZ13MaintenanceInternal

downtime of previously failed turbines during batch i

downtime of previously failed turbines that are waiting to be repaired in the catch-up period (excluding downtime due to preparation time)

Open in the explorer → Suggest an edit

Includes 5

Part of 1

Notes

References

Contributed by

S. Sanchez Perez Moreno (TU Delft)

Cite the database: Quaeghebeur, E., Sanchez Perez-Moreno, S., and Zaaijer, M. B.: WESgraph: a graph database for the wind farm domain, Wind Energ. Sci., 5, 259–284, 2020. doi:10.5194/wes-5-259-2020

This page: https://wesgraph.anemona.io/concept/downtime-of-previously-failed-turbines-during-batch-i-model/