WESgraphwind farm domain knowledge graph
VariableMBZ13Internal

time of work in progress for repair of WT failure

time of work in progress for repair of wind turbine failure

typereal
units

Open in the explorer → Suggest an edit

Appears in 9

Contributed by

S. Sanchez Perez Moreno (TU Delft), E.R.G. Quaeghebeur (TU Delft)

Cite the database: Quaeghebeur, E., Sanchez Perez-Moreno, S., and Zaaijer, M. B.: WESgraph: a graph database for the wind farm domain, Wind Energ. Sci., 5, 259–284, 2020. doi:10.5194/wes-5-259-2020

This page: https://wesgraph.anemona.io/concept/time-of-work-in-progress-for-repair-of-wt-failure-variable/