WESgraphwind farm domain knowledge graph
Model

LCOE

levelised cost of energy

Equation to calculate the levelised cost of energy. Eq. 4-2 in Great Expectations.

Open in the explorer → Suggest an edit

Includes 6

Has variants 1

Notes

Contributed by

S. Sanchez Perez Moreno (TU Delft), Edited by S. Sanchez Perez-Moreno (Anemona)

Cite the database: Quaeghebeur, E., Sanchez Perez-Moreno, S., and Zaaijer, M. B.: WESgraph: a graph database for the wind farm domain, Wind Energ. Sci., 5, 259–284, 2020. doi:10.5194/wes-5-259-2020

This page: https://wesgraph.anemona.io/concept/lcoe-model/