⚠ Contributed draft — proposed through this site, not yet reviewed by a human. Not part of the published database.
The downtime caused by a single failure — failure k of type j on turbine i in storm cycle s — split into the part that falls inside the storm and the part that falls inside the catch-up period after it, each term restricted to its own period. Equation (4-20) in Great Expectations, which the aggregated downtime models sum over.
Open in the explorer → Suggest an edit
Cite the database: Quaeghebeur, E., Sanchez Perez-Moreno, S., and Zaaijer, M. B.: WESgraph: a graph database for the wind farm domain, Wind Energ. Sci., 5, 259–284, 2020. doi:10.5194/wes-5-259-2020
This page: https://wesgraph.anemona.io/concept/downtime-of-one-failure-within-a-storm-cycle/