WESgraphwind farm domain knowledge graph
ModelMBZ13MaintenanceInternal

work in progress time per preventive maintenance action

A model for the time to perform preventive maintenance once.

Open in the explorer → Suggest an edit

Includes 7

References

Contributed by

S. Sanchez Perez Moreno (TU Delft), E.R.G. Quaeghebeur (TU Delft)

Cite the database: Quaeghebeur, E., Sanchez Perez-Moreno, S., and Zaaijer, M. B.: WESgraph: a graph database for the wind farm domain, Wind Energ. Sci., 5, 259–284, 2020. doi:10.5194/wes-5-259-2020

This page: https://wesgraph.anemona.io/concept/work-in-progress-time-per-preventive-maintenance-action-model/