WESgraphwind farm domain knowledge graph
VariableNRELCostBreakdown

O&M Equipment Purchases cost

Other purchases necessary for the operation of the wind project after COD. Examples include: safety equipment (e.g., harnesses, floatation devices), equipment to store replacement parts (e.g., climate control for spare electric cables), vehicles to support operations (e.g., fork trucks)

typereal
unit¤

Open in the explorer → Suggest an edit

Part of 1

References

Contributed by

S. Sanchez Perez Moreno (TU Delft)

Cite the database: Quaeghebeur, E., Sanchez Perez-Moreno, S., and Zaaijer, M. B.: WESgraph: a graph database for the wind farm domain, Wind Energ. Sci., 5, 259–284, 2020. doi:10.5194/wes-5-259-2020

This page: https://wesgraph.anemona.io/concept/o-m-equipment-purchases-cost/