Substation Electrical Conversion Equip integration, assembly, test and checkout cost
Activities performed by manufacturer to integrate, assemble, test, and verify the Substation Topside before delivery to customer (does not include commissioning activities)
| type | real |
|---|---|
| unit | ¤ |
Open in the explorer → Suggest an edit
Cite the database: Quaeghebeur, E., Sanchez Perez-Moreno, S., and Zaaijer, M. B.: WESgraph: a graph database for the wind farm domain, Wind Energ. Sci., 5, 259–284, 2020. doi:10.5194/wes-5-259-2020