WESgraphwind farm domain knowledge graph
ModelMBZ13CostCostInvestmentCostRotorNacelleCostInstallation

RNA installation off-shore works cost

rotor-nacelle assembly installation off-shore works cost

A model for the investment costs for the off-shore works of rotor-nacelle assembly installation: 3.4⋅10^3⋅(h_hub + 50)⋅N_t [2010 USD].

Open in the explorer → Suggest an edit

Includes 2

Notes

References

Contributed by

S. Sanchez Perez Moreno (TU Delft), Edited by S. Sanchez Perez-Moreno (Anemona)

Cite the database: Quaeghebeur, E., Sanchez Perez-Moreno, S., and Zaaijer, M. B.: WESgraph: a graph database for the wind farm domain, Wind Energ. Sci., 5, 259–284, 2020. doi:10.5194/wes-5-259-2020

This page: https://wesgraph.anemona.io/concept/rna-installation-off-shore-works-cost-model/