WESgraphwind farm domain knowledge graph
ModelMBZ13MaintenanceInternal

downtime due to preparation for type j in storm and catch-up period

total downtime due to preparation for failures of type j in catch-up period

Open in the explorer → Suggest an edit

Includes 3

Part of 1

References

Contributed by

S. Sanchez Perez Moreno (TU Delft)

Cite the database: Quaeghebeur, E., Sanchez Perez-Moreno, S., and Zaaijer, M. B.: WESgraph: a graph database for the wind farm domain, Wind Energ. Sci., 5, 259–284, 2020. doi:10.5194/wes-5-259-2020

This page: https://wesgraph.anemona.io/concept/downtime-due-to-preparation-for-type-j-in-storm-and-catch-up-period-model/