WESgraphwind farm domain knowledge graph
VariableMBZ13

site clearance cost

The (per-turbine) cost to clear the site after removal of the wind turbine from the site.

typereal
unit¤
valueZaaijer suggests 16⋅10³ USD(2010)

Open in the explorer → Suggest an edit

Part of 1

References

Contributed by

S. Sanchez Perez Moreno (TU Delft), E.R.G. Quaeghebeur (TU Delft)

Cite the database: Quaeghebeur, E., Sanchez Perez-Moreno, S., and Zaaijer, M. B.: WESgraph: a graph database for the wind farm domain, Wind Energ. Sci., 5, 259–284, 2020. doi:10.5194/wes-5-259-2020

This page: https://wesgraph.anemona.io/concept/site-clearance-cost/