The (per-turbine) cost to clear the site after removal of the wind turbine from the site.
| type | real |
|---|---|
| unit | ¤ |
| value | Zaaijer suggests 16⋅10³ USD(2010) |
Open in the explorer → Suggest an edit
Cite the database: Quaeghebeur, E., Sanchez Perez-Moreno, S., and Zaaijer, M. B.: WESgraph: a graph database for the wind farm domain, Wind Energ. Sci., 5, 259–284, 2020. doi:10.5194/wes-5-259-2020
This page: https://wesgraph.anemona.io/concept/site-clearance-cost/