WESgraphwind farm domain knowledge graph
ModelMBZ13MaintenanceInternal

lifetime number of preventive maintenance actions

A model for the total number of preventive maintenance actions on wind turbines during the lifetime of the off-shore wind farm.

Open in the explorer → Suggest an edit

Includes 3

References

Contributed by

S. Sanchez Perez Moreno (TU Delft), E.R.G. Quaeghebeur (TU Delft)

Cite the database: Quaeghebeur, E., Sanchez Perez-Moreno, S., and Zaaijer, M. B.: WESgraph: a graph database for the wind farm domain, Wind Energ. Sci., 5, 259–284, 2020. doi:10.5194/wes-5-259-2020

This page: https://wesgraph.anemona.io/concept/lifetime-number-of-preventive-maintenance-actions-model/