WESgraphwind farm domain knowledge graph
VariableNRELCostBreakdown

Onshore Electric Infra. Commissioning cost

  Process of assuring that all onshore substation systems and components are operational through a predefined series of tests and checks.

typereal
unit¤

Open in the explorer → Suggest an edit

Part of 1

References

Contributed by

S. Sanchez Perez Moreno (TU Delft)

Cite the database: Quaeghebeur, E., Sanchez Perez-Moreno, S., and Zaaijer, M. B.: WESgraph: a graph database for the wind farm domain, Wind Energ. Sci., 5, 259–284, 2020. doi:10.5194/wes-5-259-2020

This page: https://wesgraph.anemona.io/concept/onshore-electric-infra-commissioning-cost/