WESgraphwind farm domain knowledge graph
VariableNRELCostBreakdown

Onshore Substation IATC cost

Onshore Substation integration, assembly, test and checkout cost

Activities performed by manufacturer to integrate, assemble, test, and verify the Substation Substructure & Foundation before delivery to customer (does not include commissioning activities)

typereal
unit¤

Open in the explorer → Suggest an edit

Part of 1

Notes

References

Contributed by

S. Sanchez Perez Moreno (TU Delft)

Cite the database: Quaeghebeur, E., Sanchez Perez-Moreno, S., and Zaaijer, M. B.: WESgraph: a graph database for the wind farm domain, Wind Energ. Sci., 5, 259–284, 2020. doi:10.5194/wes-5-259-2020

This page: https://wesgraph.anemona.io/concept/onshore-substation-iatc-cost/